The U.S. Department of Energy has been at the center of many of the greatest achievements in science and engineering in this century. DOE spends billions of dollars funding projects--and plans to keep on spending at this rate. But, documentation shows that DOE's construction and environmental remediation projects take much longer and cost 50% more than comparable projects undertaken by other federal agencies, calling into question DOE's procedures and project management. What are the root causes for these problems?
Read More
The U.S. Department of Energy has been at the center of many of the greatest achievements in science and engineering in this century. DOE spends billions of dollars funding projects--and plans to keep on spending at this rate. But, documentation shows that DOE's construction and environmental remediation projects take much longer and cost 50% more than comparable projects undertaken by other federal agencies, calling into question DOE's procedures and project management. What are the root causes for these problems?
Read Less
Add this copy of Improving Project Management in the Department of to cart. $13.56, very good condition, Sold by ThriftBooks-Reno rated 5.0 out of 5 stars, ships from Reno, NV, UNITED STATES, published 1999 by National Academies Press.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
Very good. A copy that has been read, but remains in excellent condition. Pages are intact and are not marred by notes or highlighting, but may contain a neat previous owner name. The spine remains undamaged. An ex-library book and may have standard library stamps and/or stickers. At ThriftBooks, our motto is: Read More, Spend Less.
Add this copy of Improving Project Management in the Department of to cart. $13.93, good condition, Sold by HPB-Red rated 5.0 out of 5 stars, ships from Dallas, TX, UNITED STATES, published 1999 by National Academies Press.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
Good. Connecting readers with great books since 1972! Used textbooks may not include companion materials such as access codes, etc. May have some wear or writing/highlighting. We ship orders daily and Customer Service is our top priority!
Add this copy of Improving Project Management in the Department of to cart. $15.52, very good condition, Sold by Wonder Book - Member ABAA/ILAB rated 5.0 out of 5 stars, ships from Frederick, MD, UNITED STATES, published 1999 by National Academies Press.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
Very Good. Very Good condition. A copy that may have a few cosmetic defects. May also contain light spine creasing or a few markings such as an owner's name, short gifter's inscription or light stamp.
Add this copy of Improving Project Management in the Department of to cart. $42.65, good condition, Sold by Bonita rated 4.0 out of 5 stars, ships from Newport Coast, CA, UNITED STATES, published 1999 by National Academies Press.
Add this copy of Improving Project Management in the Department of to cart. $52.00, very good condition, Sold by Ground Zero Books, Ltd. rated 4.0 out of 5 stars, ships from Silver Spring, MD, UNITED STATES, published 1999 by National Academy Press.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
Very good. xii, 137, [1] pages. Wraps. Figures. Tables. References. Appendices. Glossary. Acronyms. Pencil erasure on title page. Project management is the discipline of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria. A project is a temporary endeavor designed to produce a unique product, service or result with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverable) undertaken to meet unique goals and objectives, typically to bring about beneficial change or added value. The temporary nature of projects stands in contrast with business as usual (or operations), which are repetitive, permanent, or semi-permanent functional activities to produce products or services. In practice, the management of such distinct production approaches requires the development of distinct technical skills and management strategies. The primary challenge of project management is to achieve all of the project goals within the given constraints. This information is usually described in project documentation, created at the beginning of the development process. The primary constraints are scope, time, quality and budget. The secondary-and more ambitious-challenge is to optimize the allocation of necessary inputs and apply them to meet pre-defined objectives. DOE requested that the National Research Council (NRC) conduct a study to review the policies, procedures, and practices used by DOE to identify, plan, design, and manage its portfolio of projects. The goal of the study was to develop recommendations to improve DOE's oversight and management of projects. The Board on Infrastructure and the Constructed Environment (BICE) advises the executive and legislative branches of government, other governmental and private sector organizations, and the general public on questions of technology, science, and public policy applied to: · the design, construction, operations, maintenance, security, and evaluation of buildings, facilities, and infrastructure systems; · the relationship between the constructed and natural environments and their interaction with human activities; · the effects of natural and manmade hazards on constructed facilities and infrastructure · the interdependencies of infrastructure systems (power, water, transportation, telecommunications, wastewater, buildings) and the potential for cascading failures The BICE brings together in an independent forum expertise from a wide range of scientific, engineering, and social science disciplines to address problems and issues in these areas. It provides a unique structure to respond to specific requests from government, or to act on its own initiative with public or private sector support. To respond to requests, the BICE oversees committee activities involving studies, briefings, workshops, symposia, and a variety of information dissemination activities. Established in 1946 as the Building Research Advisory Board, BICE and its predecessor organizations have been the principal units of the NRC concerned with the built environment. Although advisory services make up the bulk of BICE activities, a number of specific programs have been created and maintained over the years, the most significant and longest running of which is the Federal Facilities Council.