Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
The item shows wear from consistent use, but it remains in good condition and works perfectly. All pages and cover are intact (including the dust cover, if applicable). Spine may show signs of wear. Pages may include limited notes and highlighting. May NOT include discs, access code or other supplemental materials.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
Good. Good condition. With CD! 5th edition. A copy that has been read but remains intact. May contain markings such as bookplates, stamps, limited notes and highlighting, or a few light stains. NOT AVAILABLE FOR SHIPMENT OUTSIDE OF THE UNITED STATES.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
Fair. This book is a well used but readable copy. Integrity of the book is still intact with no missing pages. May have considerable notes or highlighting. This item is the book only. Is missing any CD, code, toy, or stickers, and the batteries are not included or not tested. Cover image on the book may vary. Ships out quickly in a secure plastic mailer!
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
New. Books In Good Condition. May Have a Small Publisher Mark. Ship Via Fedex. Shipping Time 7 To 10 Days. Bookseller With Over 20 Years In Book Trade.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
Good in None as issued jacket. Solid copy with neat highlighting. Missing trial version of MS Office Project CD, INCLUDES unopened student CD. Cover is glossy with mild surface wear; bumps to bottom cover corners and spine ends. Binding is tight and square. Books, box sets, and items other than standard jewel case CDs and DVDs that sell for $9 or more ship in a box; under $9 in a bubble mailer. Expedited and international orders may ship in a flat rate envelope rather than a box due to cost constraints. All US-addressed items ship with complimentary delivery confirmation.