Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies is a one-stop reference that thoroughly covers the mechanistic target of rapamycin (mTOR). mTOR, also known as the mammalian target of rapamycin, is a 289-kDa serine/threonine protein kinase that is ubiquitous throughout the body and has a critical role in gene transcription and protein formation, stem cell development, cell survival and senescence, aging, immunity, tissue regeneration and repair, metabolism, tumorigenesis, ...
Read More
Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies is a one-stop reference that thoroughly covers the mechanistic target of rapamycin (mTOR). mTOR, also known as the mammalian target of rapamycin, is a 289-kDa serine/threonine protein kinase that is ubiquitous throughout the body and has a critical role in gene transcription and protein formation, stem cell development, cell survival and senescence, aging, immunity, tissue regeneration and repair, metabolism, tumorigenesis, oxidative stress, and pathways of programmed cell death that include apoptosis and autophagy. Incorporating a translational medicine approach, this important reference highlights the basic cellular biology of mTOR pathways, presents the role of mTOR during normal physiologic function and disease, and illustrates how the mechanisms of mTOR can be targeted for current and future therapeutic treatment strategies. Coverage of mTOR signaling includes the entire life cycle of cells that impacts multiple systems of the body including those of nervous, cardiovascular, immune, musculoskeletal, endocrine, reproductive, renal, and respiratory origin.
Read Less
Add this copy of Molecules to Medicine with mTOR: Translating Critical to cart. $134.49, new condition, Sold by Booksplease rated 3.0 out of 5 stars, ships from Southport, MERSEYSIDE, UNITED KINGDOM, published 2016 by Academic Press Inc.
Add this copy of Molecules to Medicine with mTOR: Translating Critical to cart. $146.59, new condition, Sold by GreatBookPricesUK5 rated 4.0 out of 5 stars, ships from Castle Donington, DERBYSHIRE, UNITED KINGDOM, published 2016 by Academic Press Inc.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
New. Intended for professional and scholarly audience. In Stock. 100% Money Back Guarantee. Brand New, Perfect Condition, allow 4-14 business days for standard shipping. To Alaska, Hawaii, U.S. protectorate, P.O. box, and APO/FPO addresses allow 4-28 business days for Standard shipping. No expedited shipping. All orders placed with expedited shipping will be cancelled. Over 3, 000, 000 happy customers.
Add this copy of Molecules to Medicine with mTOR: Translating Critical to cart. $151.48, new condition, Sold by GreatBookPrices rated 4.0 out of 5 stars, ships from Columbia, MD, UNITED STATES, published 2016 by Academic Press Inc.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
New. Intended for professional and scholarly audience. In Stock. 100% Money Back Guarantee. Brand New, Perfect Condition, allow 4-14 business days for standard shipping. To Alaska, Hawaii, U.S. protectorate, P.O. box, and APO/FPO addresses allow 4-28 business days for Standard shipping. No expedited shipping. All orders placed with expedited shipping will be cancelled. Over 3, 000, 000 happy customers.
Add this copy of Molecules to Medicine with mTOR: Translating Critical to cart. $157.29, new condition, Sold by Ingram Customer Returns Center rated 5.0 out of 5 stars, ships from NV, USA, published 2016 by Academic Press Inc.
Add this copy of Molecules to Medicine With Mtor: Translating Critical to cart. $236.44, new condition, Sold by Bonita rated 4.0 out of 5 stars, ships from Newport Coast, CA, UNITED STATES, published 2016 by Academic Press.